«ASBESTOS GEOLOGICAL EXPLORATION ENTERPRISE» LLP

Based in the city of Zhitikara, Kostanay region.
It has its own industrial base and hostel in the city of Zhitikara.
The company’s office is located at:
Zhitikara, 4 microdistrict, building 5-a.
Telephone:
8 (714 35) 2-22-72
cell +7 775 361 06 34

Experienced specialists who know their business work at the Asbestovoye GRP LLP enterprise. The organization has qualified personnel: geologists, hydrogeologists, topographers, etc., specialists with an international certificate for assessing reserves according to the JORC standard and members of PONEN RK.

The company has been working in the region for more than 40 years and has all the technical and personnel capabilities to carry out the entire range of geological exploration work:

  • drawing up and supporting projects for all types of minerals;
  • study of the geological structure, mining-geological and engineering-geological, hydrogeological conditions of the deposit;
  • drilling operations for all types of solid minerals and water;
  • topographic-geodetic and surveying services when using subsoil;
  • engineering-geodetic and engineering-geological surveys;
  • geological three-dimensional modeling, forecast and assessment of reserves in the Micromine software, drawing up geological and economic models of the efficiency of field development;
  • development of feasibility studies of conditions, revision and approval of local technical projects for mining operations;
  • design, construction and installation work, etc.

The company drills vertical and inclined wells (45° and more) to a depth of 700 m using XY-44A, XY-44-2B, XY-44-T, SKB-51 drilling rigs, drilling is performed with a Boart Longyear rig with removable core receivers with a diameter of 96 mm HQWL and NQ WL with a diameter of 76 mm.

The drilling fleet is mobile and has a real opportunity to perform work within Kazakhstan and in the border regions of the Russian Federation. All conditions have been created for work in any weather. The company has all the technical capabilities to drill up to 3000 linear meters monthly. m.

The industrial base is located at a distance of 5 km from the city of Zhitikara. The enterprise has repair shops, turning and carpentry shops, a vehicle repair shop with overpasses and repair pits, boxes for vehicles (the premises are equipped with heating and lighting), and there is a core warehouse for storing core material. There is a crushing shop, drying, core cutting, etc.

Mechanical repair workshops of the enterprise

The industrial zone has a core warehouse with a total usable area of 298.7 m2. The height of the room is 2.64 m. The capacity is 35,000-37,000 linear meters. m. For work in winter, the city has a heated core warehouse with an area of 500 m2.

Projects of “Asbestovoye GRP” LLP

Recently (5 years), the State Reserves Committee of the Republic of Kazakhstan has reviewed and approved 7 geological reports compiled by the company’s specialists:

  1. Geological and economic assessment, feasibility study of conditions and a report with calculation of reserves for the Beschoku gold deposit, located in the Karaganda region (3 reports);
  2. Geological and economic assessment of yttrium and rare earth reserves of the Kundybai deposit as of September 1, 2014; More details about the work at the Kundybayskoye field
  3. Feasibility study of industrial standards for calculating reserves of the Dzhetygarinsky chrysotile asbestos deposit and “Report on the recalculation of reserves of the Dzhetygarinsky chrysotile asbestos deposit in the contour of the design quarry with a depth of 390 m (pit bottom elevation – 100 m) as of July 1, 2012. “, (2 reports);
  4. Geological and economic assessment of reserves of oxidized ores of the South Akkarginskoye and South Leonidovskoye gold deposits of the Tobolsk area as of July 1, 2014 (Kostanay region). More information about the work at the Yuzhno-Akkarginskoye and Yuzhno-Leonidovskoye fields

During the period from 2012 to 2015, several projects for geological exploration work on the exploration of gold (Baymenovskaya area), cobalt-nickel ores (Bersuatskoe), titanium and yttrium (Kundybaiskoe), etc. were drawn up and approved by government agencies. In addition, reports were compiled on the audit and write-off of reserves for gold deposits: Naimanzhal, Baritovoe, Koskuduk (Karaganda region), etc. More Projects of Asbestos GRP LLP.

Asbestovoye GRP LLP carried out exploration of several deposits of building stone and brick clay in the area.

In addition, the company has experience in performing prospecting geological and geochemical work to assess the ore content of the area.

Asbestovoye GRP LLP has a license KSL No. II-1335 dated May 21, 2002 to carry out survey work: engineering-geological and engineering-hydrogeological work: field soil research, hydrogeological research, engineering-geodetic work. The company’s specialists performed numerous comprehensive engineering surveys to develop design and estimate documentation for the construction of buildings, structures, as well as studies for the design and construction of roads and railways, water supply communications, gas pipelines in the Zhitikara, Kamysty and Denisov districts. Over the past few years alone, Asbestovoye GRP LLP has drilled about 75 hydrogeological wells with a total volume of 3,650 linear meters. m to study the hydrogeological conditions of deposits and water supply to populated areas.

Since 2003, Asbestovoye GRP LLP has been publishing the scientific and technical Mining and Geological Journal, which has been tested by the National Center for State Scientific and Technical Expertise JSC (NCGSTE), has great international authority, prominent scientists, experienced production workers from many countries near and far abroad.

Since 2006, Asbestovoye GRP LLP acquired a license for the Micromine software, which is widely used by enterprise specialists when drawing up reports with reserve calculations, building a block model, design quarries and calculating the economic efficiency of field development.

Asbestovoye GRP LLP developed condition projects and compiled geological reports for fields within the Republic of Kazakhstan:

  • Zhitikara (Dzhetygarinskoye) and Kiembaevskoye chrysotile asbestos deposits. 3 projects of conditions and geological reports with calculation of reserves and for prospecting work were developed at different times, reserves were approved and re-approved 5 times (in the State Reserves Committee of the USSR – 3 times and in the State Reserves Committee of the Republic of Kazakhstan – 2 times, the last time in 2013). In 2010, on the recommendation of the State Reserves Committee of the Republic of Kazakhstan, a Methodology was developed for determining the values of conversion factors from geological grades to fiber size classes of chrysotile asbestos from the Zhitikara (Dzhetygarinsky) deposit and conversion factors of size classes to the 3rd conventional sieve.
  • Zhitikara (Dzhetygarinsky) jade deposit. The reserves were approved by the State Reserves Committee of the Republic of Kazakhstan in 2003, and on the recommendation of the State Reserves Committee of the Republic of Kazakhstan in 2004, a Methodological Guide was developed for the technological testing of jade raw materials and colored stone as an associated mineral in an active quarry using the example of the Zhitikara (Dzhetygarinsky) deposit.
  • Kundybay deposit of yttrium and rare earths. In 2011, assessment standards were developed and a report was compiled with calculation of reserves and approval by the State Reserves Committee of the Republic of Kazakhstan in 2012.
  • Deposits of the Tobolsk area (South-Akkarginskoye and South-Leonidovskoye gold deposits). In 2014, assessment standards for oxidized ores were developed for the deposits, the parameters of the design quarries were determined, the reserves of oxidized ores of the deposits were calculated, the predicted resources of oxidized and sulfide ores were determined, the reserves were tested by the State Reserves Committee of the Republic of Kazakhstan.
  • Beschoku gold deposit (Karaganda region). In 2009, the Report Geological and Economic Assessment of the Beschoku gold deposit was compiled, estimated standards were developed and reserves were tested by the State Reserves Committee of the Republic of Kazakhstan. In 2011, a feasibility study of the industrial conditions of the Beschoku deposit was developed, the parameters of conditions and reserves were approved by the Central Committee of the Minsk Plant.
  • Reports on the audit and write-off of reserves were compiled for the following fields:
    • Report on the results of geological exploration and pilot production of the Naimanjal deposit with calculation of reserves of oxidized ores as of January 1, 2013.
    • Report on the results of geological exploration work for 2006-2009. and pilot production of the Baritovoe deposit with calculation of reserves in category C2 as of January 1, 2013.
    • Report on the results of geological exploration work for 2006-2010. and pilot production of the Koskuduk B deposit with calculation of reserves in category C2 as of 01/01/2013.
  • Projects have been drawn up that have passed the examination and were reviewed by the Central Committee for Reconstruction and Development:
    • Project for carrying out geological exploration work for the exploration of yttrium and rare earths at the Kundybay deposit in the Kostanay region for the period 2012-14. (2012)
    • Project for exploration of nickel-cobalt ores in the area of the Bersuat deposit in Kostanay region (2015)
    • Project for the search for gold deposits in the Baymenovskaya area (Zhitikara district, Kostanay region) (2015)
    • Report on the results of geological exploration work carried out at the Milyutinskoye cobalt-nickel ore deposit in 2006-2008.
List of scientific and production reports and projects for the period 2011-2018.
  1. Geological and economic assessment of yttrium and rare earth reserves of the Kundybai deposit as of 09/01/2011. Report in 6 books – Asbestovoye GRP LLP, Zhitikara, 2011. –214 p.
  2. Report on the recalculation of reserves of the Zhitikara (Dzhetygarinsky) chrysotile-asbestos deposit in the contour of the design quarry with a depth of 390 m (pit bottom elevation – 100 m) as of 1.07. 2012 Contract No. 121, license series MG No. 434 dated September 7, 1995. Report in 5 books – Asbestos Hydraulic fracturing LLP, Zhitikara, 2013–2014. – 199 p.
  3. Report on the results of geological exploration and pilot production of the Naimanjal deposit with calculation of reserves of oxidized ores as of January 1, 2013. Contract No. 299 dated March 4, 1999. Report in 9 books – Asbestos Hydraulic fracturing LLP, Zhitikara, 2014 . – 187 p.
  4. Report on the results of geological exploration work in 2006-2010 and pilot industrial production of the Koskuduk B deposit with calculation of reserves in category C2 as of 01/01/2013. Contract No. 299 dated 03/04/1999. Report in 8 books – LLP ” Asbestos hydraulic fracturing”, Zhitikara, 2013. – 190 p.
  5. Report on the results of geological exploration work for 2006-2009. and experimental production of the Baritovoe deposit with calculation of reserves in category C2 as of January 1, 2013. Contract No. 299 dated March 4, 1999. Report in 2 books. – LLP “Asbestos GRP”, Zhitikara, 2013. – 278 p.
  6. Preliminary geological and economic assessment of the South Akkarginskoye and South Leonidovskoye gold deposits of the Tobolsk area as of July 1, 2014 (Kostanay region). Contract No. 2182 dated October 23, 2006. Report in 3 books – Asbestovoye GRP LLP, Zhitikara, 2014. – 220 p.
  7. Project for carrying out geological exploration work for the exploration of yttrium and rare earths at the Kundybay deposit in the Kostanay region for the period 2012-14. Contract No. 115, license series MG No. 773 dated December 11, 1995 – Asbestovoye GRP LLP, Zhitikara, 2012. – 139 p.
  8. Project for prospecting for nickel-cobalt ores in the area of the Bersuat deposit in the Kostanay region. – Asbestos hydraulic fracturing, Zhitikara, 2015. – 125 p.
  9. Project for the search for gold deposits in the Baymenovskaya area (Zhitikarinsky district, Kostanay region). – LLP “Asbestos hydraulic fracturing”, Zhitikara, 2015. – 138 p.

Contact information:
Telephone: +7 (71435) 2-22-72
Telephone: +7 (71435) 2-35-60
Fax: +7 (71435) 2-22-72

e-mail:
nizamid@mail.ru
agrpgeol@mail.ru

Adress: 110700, Republic of Kazakhstan, Kostanay region,
Zhitikara, microdistrict 4, building 5 “A”,  Asbestovoye GRP LLP